
Kansas City Air Tempering Project
Clients
Ford Motor Co.
Location
Kansas City, MO
Size
4,700,000 SF
View Project
.jpg)
The Freud Street Metering Facility design-build in Detroit, Mich., consisted of a 565,000-square-foot pre-engineered (PEMB) expansion to an existing 360,000-square-foot tilt-up facility. The foundation for the expansion required concrete caissons at all column locations with concrete grade beam perimeter foundation. The pre-engineered structure consisted of 115 overhead door and dock leveler positions, two grade level ramp doors and one trash compactor door. The structure also included an office, restroom space, a locker room and break room fit outs with multiple restroom pod locations.
.jpg)

Grading, excavating, underground utilities and exterior pavements were performed by the owner’s self-perform group. The fast-track project took a little over a year to complete, starting July 2020 and completing July 2021.







































.jpg)








.jpg)

















.jpg)


.jpg)










Whether you are planning a project, evaluating delivery methods, or looking to partner with our team, Roncelli is ready to help you build with clarity and confidence.